VIDEO | Hard days refitting the Khumbu Icefall

We have renewed 60% of the previous equipment affected by the hard weather conditions of the last weeks. It has been a laborious work in which we have retrofitted the complicated Khumbu Icefall located in the route between the Base Camp and the First Altitude Camp. Besides, I show you our previous days in a video format. I hope you enjoy it and feel every breath of our body! Click on play!

The song: Esne Beltza ”Quien manda (Hemen eta hor)” Ft Mala Rodriguez & Fermin Muguruza.

Social Media:

Facebook: https://www.facebook.com/alex.txikon.5/

Twitter: https://twitter.com/alextxikon?lang=es

Instagram: https://www.instagram.com/alextxikon/

Alex

;)

       

Last news

 
REPORT | Difficult days equipping up to 7850m!
Hard days and nights at height. Although we have been very close to reaching the Camp 4, we have given the work for finished. The weather started to change and one of our mates wasn’t feeling very well. However, we are very happy for the work done in extreme conditions, equipping up to 7850 meters,
REPORT | Top in Pumori mountain (7161m)
We have conquered the Pumori mountain! “The Daughter of the Mountain”, known as one of the most beautiful mountains of the world. After ascending until the C2 of Everest we have made a standby to ascend this beautiful mountain and check our conditions for the Everest. The team is formed by Ali Sadpara, Nuri, Temba